![]() |
![]() |
![]() |
| Course of Action: Share your vision: Prepare plans and be ready with photographs so your meeting with the builder will be more productive and you can make sure he knows exactly what are your requirements and expectations. You will also be able to visit finished projects and view examples of earlier work. Review and sign the contract: Our builders will not only provide their own labour and craft, they oversee all parts of the construction. This involves coordinating all the tradesmen such as plumbers, tilers and roofers and ensures that the building meets your expectations. A signed contract that includes every job the contractor will do, how long it will take and how much it will cost. Payment plan: Work out a payment plan that you both agree to. In Bulgaria you usually pay the builder 40 percent before starting. But there are some exceptions, such as heating systems and kitchen renovations, which require large amounts of money up front. Demolition and disposal is the beginning of the construction project. Plumbing, wiring and any insulation are revealed, as are any deficiencies that were not picked up during the house inspection. Rough framing includes new walls, steel beams for load-bearing, bulkheads, new exterior and interior doors and doorways, new rooflines, and new or upgraded windows. Lighting consists of main, task and accent lighting. Main lighting is over head, task lighting is under cabinets or over counters while accent lighting highlights special features. Lighting can be a mixture of different types including halogen and incandescent. Increase energy efficiency by using compact fluorescents and dimmer switches. Wiring for lighting, electrical outlets, telephones, internet/TV, alarm, speakers, will be installed at this time. Make sure you have enough electrical outlets at the right height for all your small appliances. Plumbing will affect flooring particularly if moving the sink's location. Think about new drains, how many drains and pipes are needed and how the plumbing affects the layout and space beneath the kitchen. Heating and air conditioning: Radiators or wood burners may need to be moved or added. If you're adding an addition, your furnace and air conditioning system may need to be upgraded. Ventilation may need to be adjusted if you're improving your home's insulation to allow for fresh air intake and exhaust. Insulation is added before the drywall is put on, but after electrical, plumbing and heating and air conditioning. |
| Balchik Homes e-mail: admin@balchikhomes.com |
| telephone: +359 579 72526 Bulgaria |




![]() |